The nurse is installing a bed safety-monitoring device for a client. W

The nurse is installing a bed safety-monitoring device for a client. What should the nurse do after testing the device and alarm sound?

1. Place the leg band on the client with the leg in a straight horizontal position.
2. Place the sensor under the mattress near the shoulder region.
3. Set a time delay for 30 seconds.
4. Connect the sensor pad to the control unit.

 

ANSWER

Correct Answer: 1
Rationale 1: After testing the device and alarm sound, the nurse should place the leg band on the client with the leg in a straight horizontal position.
Rationale 2: The sensor should be placed under the mattress at the buttocks area, not the shoulder area.
Rationale 3: Time delays should be between 1 and 12 seconds.
Rationale 4: Connecting the sensor pad to the control unit is the last step when installing the bed safety-monitoring device.

Expert paper writers are just a few clicks away

Place an order in 3 easy steps. Takes less than 5 mins.

Calculate the price of your order

You will get a personal manager and a discount.
We'll send you the first draft for approval by at
Total price:
$0.00