The IRR decision criterion is to accept a project if the IRR exceeds the desired or required return rate and to reject the project if the IRR is less than the desired or required rate of return.
Indicate whether the statement is true or false.
ANSWER
Answer: TRUE
Place an order in 3 easy steps. Takes less than 5 mins.