The ________ method to analyze cash flows associated with a project does not consider the time value of money.
A) payback period
B) net present value (NPV)
C) profitability index (PI)
D) internal rate of return (IRR)
E) modified internal rate of return
ANSWER
A
Place an order in 3 easy steps. Takes less than 5 mins.