On a practical basis a, manager should always accept all positive NPV

On a practical basis a, manager should always accept all positive NPV projects even if this means exceeding a limited budget.

Indicate whether the statement is true or false.

 

 

ANSWER

Answer: FALSE
Explanation: On a practical basis, a manager should accept the combination of positive NPV projects that maximizes the total NPV while still operating within budget.