QUESTION
In Week 1, you discussed GIG, Inc.s benefits and concerns with moving to the cloud. In Week 2, you created a high-level diagram of a system using built-in AWS that provided reliability, availability, and continuity across the migrated environment. In Week 3, you chose a database and created a diagram that visualized the chosen system and implementation steps. Last week, you created a spreadsheet that covered each level and provided a summary of the structures that explained the security benefits.
This week, all your work from previous weeks and integrate it into your migration plan in a cohesive manner. Additional material about the transition may be required. The plan will be presented to the CEO, CFO, and CTO and should have a professional construction.
a 10- to 12-slide multimedia-rich Microsoft® PowerPoint® presentation that explains the proposed migration plan and includes the following items:
your plan and presentation.
ANSWER:
Place an order in 3 easy steps. Takes less than 5 mins.