QUESTION
BSOP 429 Production Activity Control and Just-in-timeWeek 2Week 2 DQ 1 (Lead Times (Graded)Which of the four lead time elements discussed on page 279 might cause the most difficulty? Why? Why might other lead time elements be less important? What does the textbook say about queue time that may not make it the most difficult to manage? And since it may not be the most difficult, which of the remaining three elements is the most difficult to manage? And why?Week 2 DQ 2 (Lab 1 Discussion (Graded)What should the first step be in our Week 2 Lab Assignment? Why? What would the next step be? What are the remaining steps to calculating earliest due date (EDD) as outlined by the lecture? And what pitfalls should we avoid in our calculations for this week’s lab?Week 2 Assignments:BSOP 429 Week 2 PAC Framework â AssignmentBSOP 429 Week 2 The Scheduling Lab