For Figure 6.9 in the book, MRTS = K/(4L) with capital (K) on the vertical axis of the isoquant map. Suppose L=100 hours and K=400 machine hours at the current level of output.
How much additional labor is required to maintain output if we reduce capital by one machine hour? A) One hour
B) Two hours
C) Three hours
D) Four hours
ANSWER
A
Place an order in 3 easy steps. Takes less than 5 mins.