QUESTION
Which of the following is NOT part of lean manufacturing?
A) Waste is eliminated to the extent possible.
B) Labor is pared to the minimum.
C) Machines use the fewest moving parts.
D) Rejected products are considered unacceptable.
E) Materials are delivered well in advance of when they are needed.
ANSWER
Answer: E
Explanation: E) In lean manufacturing, materials are delivered on the just-in-time system; that is, they are delivered as closely as possible to the time when they are needed.